Associate Professor
Industrial & Production Engineering
Rajshahi University of Engineering & Technology
Industrial & Production Engineering
Rajshahi University of Engineering & Technology
Industrial & Production Engineering
Rajshahi University of Engineering & Technology
Industrial & Production Engineering
Rajshahi University of Engineering & Technology
Nagoya Institute of Technology, Japan.
Rajshahi University of Engineering & Technology
Rajshahi University of Engineering & Technology
New Govt. Degree College, Rajshahi
Raipur Secondary School
SL | Authors | Title | Publisher Details | Publication Year | Type |
1 | Aizizul Haque Raza, Md. Mohibul Islam, Fahim Ul Haque, Sonia Akhter, and Umma Suriaya Parvin Kakon | An Optimized Product Delivery System for RedX Using Drones: A Case Study | Journal of Comprehensive Business Administration Research (BON VIEW PUBLISHING) | 2024 | Journal |
2 | Md. Mohibul Islam and Masahiro Arakawa | Development of an integrated scenario-based stochastic rolling-planning multistage logistics model considering various risks | Journal of Heliyon, Vol. 9, Issue 11, Pp. 1-24, Publisher: Elsevier | 2023 | Journal |
3 | Md. Mohibul ISLAM; Masahiro ARAKAWA | Integrated multi-criteria group decision-making model for supplier selection in an uncertain environment | Cogent Engineering, Vol. 9, No. 1, Pp. 1-30 (Taylor & Francis) | 2022 | Journal |
4 | Md. Mohibul Islam; Masahiro Arakawa | DEVELOPMENT OF ROLLING PLANNING BASE MULTI-STAGE LOGISTICS MODEL CONSIDERING VARIOUS RISKS. | Proceedings of the International Symposium on Flexible Automation, ISFA 2022-074, July 3-7, Keio University, Yokohama, Japan. | 2022 | Conference |
5 | Md Mohibul ISLAM; Masahiro ARAKAWA | Hesitant fuzzy-based integrated multi-criteria group decision-making model for supplier selection | Journal of Advanced Mechanical Design, Systems, and Manufacturing, Vol.16, No. 4 (The Japan Society of Mechanical Engineers) | 2022 | Journal |
6 | Md. Ariful Haque, A M Almas Shahriyar Azad, Moumita Ghosh, Zarin Tasnim Oishi and Md. Mohibul Islam | An Integrated Framework for Investigating Relationship between Overall Equipment Effectiveness (OEE) and Downtime | Proceedings of the 5th International Conference on Industrial & Mechanical Engineering and Operations Management, Dhaka, Bangladesh, December 26-28, 2022 | 2022 | Conference |
7 | Md. Mohibul Islam; Masahiro Arakawa | ROBUST MULTI CRITERIA DECISION MAKING MODEL FOR SUPPLIER SELECTION IN FUZZY ENVIRONMENT | Proceedings of International Symposium on Scheduling 2021, June 25-27, Hosei University, Kyoto, Japan. | 2021 | Conference |
8 | Md Mohibul ISLAM; Masahiro ARAKAWA | Rolling planning method for two-stage logistics system under unsteady demand | Journal of Advanced Mechanical Design, Systems, and Manufacturing, Vol. 15, No. 3, Pp. 1-22, (The Japan Society of Mechanical Engineers)) | 2021 | Journal |
9 | Md Mohibul Islam, Masahiro Arakawa | Rolling Planning Method for Logistic System for Controlling Inventory and Stock-out Under Unsteady Demand | 3rd International Conference on Mechanical Manufacturing and Industrial Engineering, 2020, August 26-28, Tokyo, Japan (IOP Conference Series: Material Science and Engineering) | 2020 | Conference |
10 | Shofe Ahmed Mozumder and Md. Mohibul Islam | Analyzing the Scenario of Ready-Made Garments of Bangladesh for Making the Management More Effective and Green | Journal of Modern Science and Technology, Vol. 6. No. 1. Pp. 22-36 | 2018 | Journal |
11 | Ashikur Rahman, Md. Mohibul Islam and Md. Iqbal Hossain | Determination of Total Labor Cost Based on Time Driven Activities | Global Science and Technology Journal | 2018 | Journal |
12 | Farhana Haque, Raisa Tabassum and Md. Mohibul Islam | Project Scheduling Problem, Quality Loss and Time-Cost Tradeoff | World Review of Business Research, Vol. 7. No. 2. Pp. 68–87 | 2017 | Journal |
13 | Firoz Kabir, Safiul Kabir and Md. Mohibul Islam, | Integrated Production Planning in Multi- Component Single Product Environment | Journal of Modern Science and Technology, Vol. 5. No. 1. Pp. 47-65 | 2017 | Journal |
14 | Kabita Mondal, Md. Mohibul Islam and Sarwary Islam | Multi-Stage, Multi-Period Aggregate Production Planning For Minimizing Total Supply Chain Cost | 14th Global Engineering, Science and Technology Conference | 2017 | Conference |
15 | Md. Mohibul Islam and Md. Mosharraf Hossain | Multi Product Multi Period Aggregate Production Planning in an Uncertain Environment | Global Science and Technology Journal, Vol. 4. No. 1. Pp. 1-19. | 2016 | Journal |
16 | Md. Rezaul Karim and Md. Mohibul Islam | Comparison of Employee Motivational Factors and Their Impact between Bangladeshi & Multinational Companies (RMG Sector): A Case Study | 14th Asian Business Research Conference | 2016 | Conference |
17 | Tanvir Ahmed, Rayhan Parvez Koushik and Md. Mohibul Islam | Changeover Time and Non Value Added Time Reduction Policy in RMG Sector in Bangladesh: A Case Study | 12th Global Engineering, Science and Technology Conference | 2016 | Conference |
18 | Md. Mashum Billal, Md. Mohibul Islam, Md. Shah Alam and Md. Mosharraf Hossain | Optimal Supply Chain Network Opportunities: The Case of Bangladesh | World Journal of Social Science, Vol. 5, No. 3, Pp. 197-210 | 2015 | Journal |
19 | Md. Mohibul Islam, Sajal Ghosh and Mahfujur Rahman | Solving Capacitated Vehicle Routing Problem by Using Heuristic Approaches: A Case Study | Journal of Modern Science and Technology, Vol. 3. No. 1, Pp. 135-146. | 2015 | Journal |
20 | Lutfun Nahar Nipa and Md. Mohibul Islam | Intelligent Traffic Control System Based On Round Robin Scheduling Algorithm | International Journal of Scientific and Research Publications, Vol. 5, Issue 8. | 2015 | Journal |
21 | Nadia Tanzeem, Md. Mohibul Islam and Nusrat Jahan | Solving a Transportation Problem of a Typical Dairy Firm Considering Fuzzy Environment | International Conference on Mechanical Industrial and Materials Engineering | 2015 | Conference |
22 | Md. Mohibul Islam, Md. Mosharraf Hossain, Md. Ahsanul Haque Khan and Md. Rokebul Islam | Application of fuzzy logic in aggregate production planning | International conference on Mechanical, Industrial and Materials Engineering | 2013 | Conference |
23 | Md. Mohibul Islam and Md. Mosharraf Hossain | Statistical quality control approach in typical garments manufacturing industry in Bangladesh: A case study | 9th Asian Business Research Conference | 2013 | Conference |
24 | Md. Mohibul Islam, NilufaYeasmin, Shamima Nasrin Khan, Mst. Anjuman Ara and Md. Mosharraf Hossain | Study on Workers Occupational Stress and Guidelines at Jute Mills in Bangladesh | International Conference on Mechanical, Industrial and Energy Engineering | 2013 | Conference |
25 | Md. Mohibul Islam, Md. Mosharraf Hossain and Md. Ariful Islam | A Comparative Method Study for Printing Time Reduction in Knitwear Manufacturing Company in Bangladesh: A Case Study | Journal of Social Science, Vol. 2, No. 5, Pp. 218 – 224. | 2012 | Journal |
26 | Md. Mohibul Islam, Khan Md. Ariful Haque, Md. Mosharraf Hossain, Md. Idris Ali and Md. Azizur Rahman | Factors Influencing Motivation of Garments Worker : A Case Study | 7th Asian Business Research Conference | 2012 | Conference |
27 | Khairun Nahar, Md. Mohibul Islam, Md. Mustafizur Rahman and Md. Mosharraf Hossain | Evaluation of OEE for implementing total productive maintenance (TPM) in a sewing machine in a knit Factory | Global Engineering, Science and Technology Conference | 2012 | Conference |
28 | Md. Mohibul Islam, Md. Mosharraf Hossain, Khan Md. Ariful Haque, Md. Ariful Islam, Md. Mahabub Islam and Sazedul Karim | Production Scheduling in a Garments Manufacturing Company: A Case Study | Conference on Engineering Research, Innovation and Education | 2011 | Conference |
Phd Students | |||
Id | Name | Thesis work | Current Position |
Masters Students | |||
Id | Name | Thesis work | Current Position |
Undergraduate Students | |||
Id | Name | Thesis work | Current Position |
135004, 135061 | Mansura Khanom and Showkat Jahan Saki | Supply chain information risk assessment and mitigation approach by using interpretive structural modeling | Working in a reputed company |
135031, 135032 | Md. Siddiqur Rahman and Murshida Akter | Determination of supply chain disruption recovery cost based on safety stock and carbon emission | Working in a reputed company |
125039, 125042 | Ashikur Rahman and Md. Iqbal Hossain | Determination of total labor cost based on time driven activities | Working in a reputed company |
125005, 125040 | Shofe Ahmed Mozumder, Md. Saddam Hossain | Analyzing the scenario of ready-made garments of Bangladesh for making the management more effective and green | Working in a reputed company |
125016, 125026 | Kobita Mondal and Sarwary Islam Urmi | Multi-stage multi-period supply chain planning for minimizing total supply chain cost | Working in a reputed company |
115008, 115009 | Tanvir Ahmed and Rayhan Parvez Koushik | Changeover time and non-value added time reduction policy in RMG sector in Bangladesh: A case study | Working in a reputed company |
115001 | Farhana Haque and Raisha Tabassum | Project scheduling problem, quality lost and time-cost tradeoff | Working in a reputed company |
105006, 105014 | Md. Firoz Kabir and Md. Safiul Kabir | Integrated production planning in the case of multi-component single product environment | Working in a reputed company |
105005 | Md. Rezaul Karim | Comparion of employees motivational process between Bangladeshi & Multinational companies (RMG Sector): A case study | Working in a reputed company |
095001, 095014 | Nadia Tanzeem and Nusrat Jahan | Solving a transportation problem of a typical dairy firm considering fuzzy environment | Working in a reputed company |
095009, 095018 | Shuvo Kumar Pal and Md. Hassan Ahammad | Risk assessment of a typical refinery factor by using fuzzy logic | Working in a reputed company |
085008, 085009 | Sajal Ghosh and Md. Mahfujur Rahman | Solving capacitated vehicle routing problem (CVRP) by using heuristic approaches: A case study | Working in a reputed company |
135027, 135044 | Md. Sazzat Hossain and Syed Tanvir Ahamed Sourav | The influence of Forecasting Parameters in Reducing Bullwheep Effect | Working in a reputed company |
Activity | Description |
---|---|
Preparation of the Program Self Assessment Report (PSAC) | Working for accreditation for the IPE department. |